1, Grange Avenue, Cheadle Hulme – Taking the walls back to brickwork, removing floor and insulating same. Re-board and skim room with new skirting boards and architraves
2, Getting ready to start a rear single storey wrap around extension in Chapel-en-le-frith.
1, Swann Lane, Cheadle Hulme – Converting a bathroom back in to a bedroom and creating a new en-suite in an existing bedroom.
2, Grange Avenue, Cheadle Hulme – Removing wall separating a kitchen and dining room.
This will provide a small hallway to the new front door and shower room and Wc
Two new dormer windows and a new bathroom created in the roof space.
Start of a rear extension with re modelled existing roof to incorporate a vaulted ceiling with Velux’s, Structural alterations to interior
We are making alterations to an existing sun room and removing some structural walls to accommodate a new utility room and fitted kitchen.
Rear Single Storey Extension in Bramhall
Swann Lane, Cheadle Hulme – Part loft conversion to create en suite and full refurbishment of family bathroom
Once the brickwork is finished and we’ve secured the buildings, we will drop the internal load bearing walls to create a much bigger open space and then fit the two new kitchens.
“Happy New Year – First post this year!”
Footings are ready to be poured for the adjoining extensions we are building in Chorlton
Structural opening, new utility room and fitted kitchen in Cheadle Hulme
August 2020
September 2019 – Two Storey Front and Rear Extension in Cheadle Hulme
July 2019 – Two Storey Front and Rear Extension in Cheadle Hulme
July 2019 – Two Storey Front and Rear Extension in Cheadle Hulme
July 2019 – Porch
June 2019 – Dormer Roof Window and Loft Conversion in Cheadle Hulme Nearly Finished.
June 2019 – Dormer Roof Window and Loft Conversion in Cheadle Hulme
May 2019 – Garage Conversion in Cheadle Hulme to create a utility room and a front office.
April 2019 – Single Storey Rear Extension, New Kitchen, Utility Room and Cloakroom in Bramhall
Going to be a stunning kitchen!
Taking shape now! – Two more pieces of steel to go in.
Now that the snow has cleared, we can crack on!
Cheadle Hulme Snow
Single Storey Brick Built Rear extension – Acre Lane, Cheadle Hulme
Steel Beams being supported by a genie lift and acrow props.[/caption]
Rear Extension, Knock Through, Fitted Kitchen
We will be starting a garage conversion in Cheadle Hulme – Pictures to follow.
This week:
We are just coming to the end of a conversion in Prestbury, we have converted an office complex into a high-end Clinic which will cater to the ladies of Cheshire.
Last Week – August
We were given the opportunity to construct this authentic, very heavy fountain in the rear garden of a house in Cheadle Hulme. It stands about 2 metres tall by 3 metres wide
” a little bit of Rome in Cheadle Hulme”
We have previously worked on this property. We built a rear two-storey extension and a new dormer window
Rear Two Storey Extension Cheadle Hulme
July 2017 – Rear Extension – Cheadle Hulme
Not quite as big as the last job but we adopt the same care and attention to detail as we do on every job.
July 2017 – Kitchens well on the way, Looks Great.
Kitchens due on Tuesday, we’d better get the plastering finished!
Only three more beams to go in!
June 2017 – Summers Here!
June’s arrival marking the start of summer is perfect timing in order to enjoy the benefits of the 4.3m Bi-Fold Fold doors just fitted.
May 2017
Single Storey Rear Extension – Cheadle Hulme
The attention to detail is really paying off:
We’ve kept the ‘Flemish’ brick bond to match the existing house and have used red engineer bonded squint bricks on the 45 deg corner. We’ve continued the red engineer detail below damp and around the door opening. In addition, we have copied the exposed rafter leg and gutter detail from the original house.
Bi-Fold doors to be fitted next week.
“Can’t believe I’ve not updated this page since September last year!”
Carrying on from last week.
We have now dug the footings for the extension and will be pouring the concrete on Monday, once the pump arrives.
This is what we were doing last week.
Cheadle Hulme
we have demolished an existing garage and are now building a detached garden office having moved it further down the garden.
Once the garden office is finished we will start building a single storey rear and side extension incorporating an extended kitchen,
family room, utility room and ground floor shower room.
This is where we were in July.
High Lane
Extending a house in High lane, Stockport by building a rear single-storey timber framed extension.
We built a conservatory at this property about 10 years ago, you can just see it in the background!
This is where we were in June.
Full bathroom conversion in Wilmslow to a property we extended last year.
This is where we were in May.
Garage conversion to utility room in Bramhall
This is where we were in April.
Porch extension with Utility Room in Cheadle Hulme
This is the 6th Porch of a similar type that we have built on this road.